Difference between revisions of "Man Acquisition"
Line 8: | Line 8: | ||
<!--T:2--> | <!--T:2--> | ||
− | For | + | For information about the Step-By-Step Wizard look at the [[Wiz_Acquisition|Wizard Acquisition]] page. |
<!--T:11--> | <!--T:11--> | ||
− | In a '''Structured Project''' outside | + | In a '''Structured Project''' outside the wizard, there are 3 procedures to acquire data from the scanner. |
== Simple == <!--T:3--> | == Simple == <!--T:3--> | ||
<!--T:12--> | <!--T:12--> | ||
− | This is the | + | This is the easiest way to acquire data, and the most used: |
<!--T:13--> | <!--T:13--> | ||
− | # Put the object inside the scanner over the | + | # Put the object inside the scanner over the appropriate model holder |
− | # Select | + | # Select, in the ''Project Tree'', the object to scan |
# Click the Acquisition button on the [[Main_Toolbar|Main Toolbar]] | # Click the Acquisition button on the [[Main_Toolbar|Main Toolbar]] | ||
<!--T:14--> | <!--T:14--> | ||
− | The scanner will then acquire the object | + | The scanner will then acquire the object with the strategy of the selected element and update the status of the ''Project Tree'' |
<!--T:15--> | <!--T:15--> | ||
Line 36: | Line 36: | ||
<!--T:18--> | <!--T:18--> | ||
# Select from the ''Project Tree'' all the dies to be scanned | # Select from the ''Project Tree'' all the dies to be scanned | ||
− | # Click the Multi-Die Acquisition button that will appear on the [[Main_Toolbar|Main Toolbar]] | + | # Click the Multi-Die Acquisition button that will appear on the [[Main_Toolbar|Main Toolbar]]. At least 2 dies have to be selected in the ''Project Tree'' |
# Put the dies in the support as the software will show on the Top Right window and put the Multi-Die support inside the scanner | # Put the dies in the support as the software will show on the Top Right window and put the Multi-Die support inside the scanner | ||
# Click the ''Start Acquisition'' button | # Click the ''Start Acquisition'' button | ||
<!--T:19--> | <!--T:19--> | ||
− | The scanner will acquire the data, | + | The scanner will acquire the data, identifying every single die and updating the status of the ''Project Tree'' |
<!--T:20--> | <!--T:20--> | ||
Line 49: | Line 49: | ||
<!--T:22--> | <!--T:22--> | ||
− | To acquire a single | + | To acquire a single 3D image, and not a 360° object reconstruction (for testing or to acquire a big articulation in a small scanner): |
<!--T:23--> | <!--T:23--> | ||
− | # Put the object inside the scanner in the best way | + | # Put the object inside the scanner, in the best possible way |
# Use the [[Support_Toolbars_And_Menus#Tools|Single Acquisition]] tool | # Use the [[Support_Toolbars_And_Menus#Tools|Single Acquisition]] tool | ||
<!--T:24--> | <!--T:24--> | ||
− | The software will | + | The software will carry out a single acquisition without moving the manipulator |
= Integration = <!--T:25--> | = Integration = <!--T:25--> | ||
<!--T:26--> | <!--T:26--> | ||
− | After | + | After an object has been acquired in the scanner, there could be the need to add further information to the starting scan. For example, part of the object may be missing due to shadows or because the acquisition strategy has not covered a specific point of view. |
<!--T:4--> | <!--T:4--> | ||
− | + | In order to integrate additional information, use the Integrate Acquisition button on the [[Main_Toolbar|Main Toolbar]]. This will start the ''Integration Mode'', providing 3 different integration tools. It is possible to switch from one tool to the other. Confirm the modification with the Apply [[File:Dental_2_5_confirmButton.png|x35px]] button or discard it with the Cancel [[File:Dental_2_5_cancelButton.png|x35px]] button. | |
<!--T:27--> | <!--T:27--> | ||
− | It is possible to add an | + | It is possible to add an unlimited number of acquisitions but '''adding to much data can slow down the project and increase the project disk size''' |
== Single == <!--T:5--> | == Single == <!--T:5--> | ||
Line 75: | Line 75: | ||
<!--T:29--> | <!--T:29--> | ||
− | # Rotate the 3D view | + | # Rotate the 3D view so that the screen will show exactly the part of the object to be integrated |
# Click the Start Integration [[File:Dental_2_5_startIntegrationButton.png|x35px]] button | # Click the Start Integration [[File:Dental_2_5_startIntegrationButton.png|x35px]] button | ||
<!--T:6--> | <!--T:6--> | ||
− | If the last added acquisition is not good, not needed or problematic it is possible to remove it with the Undo [[File:Dental_2_5_undoLastIntegrationBtn.png|x35px]] button. | + | If the last added acquisition is not good, not needed or problematic, it is possible to remove it with the Undo [[File:Dental_2_5_undoLastIntegrationBtn.png|x35px]] button. |
<!--T:30--> | <!--T:30--> | ||
− | If the object is not in the original scanning position the software can not integrate the information | + | If the object is not in the original scanning position, the software can not correctly integrate the information. It is possible to try to fix this using the ''Calc Integration Position'' button. |
<!--T:31--> | <!--T:31--> | ||
Line 90: | Line 90: | ||
<!--T:32--> | <!--T:32--> | ||
− | The | + | The Custom mode, instead of scanning one position at a time, allows to create a costumized sequence of positions and then the scanner will carry out all the acquisitions together. <br /> |
<!--T:33--> | <!--T:33--> | ||
Line 96: | Line 96: | ||
<!--T:34--> | <!--T:34--> | ||
− | # Rotate the 3D view | + | # Rotate the 3D view so that the screen will show exactly the part to be integrated |
# Click the Add Position [[File:Dental_2_5_confirmButton.png|x35px]] button | # Click the Add Position [[File:Dental_2_5_confirmButton.png|x35px]] button | ||
Line 107: | Line 107: | ||
<!--T:37--> | <!--T:37--> | ||
− | To start the scan click the Start Integration [[File:Dental_2_5_startIntegrationButton.png|x35px]] button | + | To start the scan, click the Start Integration [[File:Dental_2_5_startIntegrationButton.png|x35px]] button |
<!--T:38--> | <!--T:38--> | ||
Line 115: | Line 115: | ||
<!--T:40--> | <!--T:40--> | ||
− | The full integration is the easiest: | + | The full integration is the easiest mode: it allows to select as many positions as needed and in which degree the plate must tilt to complete the image. <br /> |
− | Then by clicking the Start Integration [[File:Dental_2_5_startIntegrationButton.png|x35px]] button the scanner will tilt the model and | + | Then, by clicking the Start Integration [[File:Dental_2_5_startIntegrationButton.png|x35px]] button, the scanner will tilt the model and carry out a 360° acquisition using the number of positions selected. |
<!--T:41--> | <!--T:41--> | ||
Line 124: | Line 124: | ||
<!--T:42--> | <!--T:42--> | ||
− | When the ''Project Tree'' is created the software will select a specific strategy for every element in the project trying to maximize the scan quality and saving space. To change the strategy for a specific element of the project: | + | When the ''Project Tree'' is created, the software will select a specific strategy for every element in the project, trying to maximize the scan quality and saving space. To change the strategy for a specific element of the project: |
<!--T:43--> | <!--T:43--> | ||
Line 135: | Line 135: | ||
<!--T:9--> | <!--T:9--> | ||
− | + | It's possible to return to the [[Main_Page|Main Page]] or continue to the [[Man_DataEditing|Data Editing]] page | |
</translate> | </translate> |
Revision as of 07:54, 1 September 2015
Contents
Acquisitions
Acquiring data from the scanner and creating a virtual 3D representation of an object is the primary function of the OpticalRevEng Dental software.
For information about the Step-By-Step Wizard look at the Wizard Acquisition page.
In a Structured Project outside the wizard, there are 3 procedures to acquire data from the scanner.
Simple
This is the easiest way to acquire data, and the most used:
- Put the object inside the scanner over the appropriate model holder
- Select, in the Project Tree, the object to scan
- Click the Acquisition button on the Main Toolbar
The scanner will then acquire the object with the strategy of the selected element and update the status of the Project Tree
Multi-Die
To acquire multiple dies in one scan using the multi-die support:
- Select from the Project Tree all the dies to be scanned
- Click the Multi-Die Acquisition button that will appear on the Main Toolbar. At least 2 dies have to be selected in the Project Tree
- Put the dies in the support as the software will show on the Top Right window and put the Multi-Die support inside the scanner
- Click the Start Acquisition button
The scanner will acquire the data, identifying every single die and updating the status of the Project Tree
Single
To acquire a single 3D image, and not a 360° object reconstruction (for testing or to acquire a big articulation in a small scanner):
- Put the object inside the scanner, in the best possible way
- Use the Single Acquisition tool
The software will carry out a single acquisition without moving the manipulator
Integration
After an object has been acquired in the scanner, there could be the need to add further information to the starting scan. For example, part of the object may be missing due to shadows or because the acquisition strategy has not covered a specific point of view.
In order to integrate additional information, use the Integrate Acquisition button on the Main Toolbar. This will start the Integration Mode, providing 3 different integration tools. It is possible to switch from one tool to the other. Confirm the modification with the Apply button or discard it with the Cancel button.
It is possible to add an unlimited number of acquisitions but adding to much data can slow down the project and increase the project disk size
Single
The single integration mode allows to add information from a specific point of view. To add information:
- Rotate the 3D view so that the screen will show exactly the part of the object to be integrated
- Click the Start Integration button
If the last added acquisition is not good, not needed or problematic, it is possible to remove it with the Undo button.
If the object is not in the original scanning position, the software can not correctly integrate the information. It is possible to try to fix this using the Calc Integration Position button.
Custom
The Custom mode, instead of scanning one position at a time, allows to create a costumized sequence of positions and then the scanner will carry out all the acquisitions together.
To add a position:
- Rotate the 3D view so that the screen will show exactly the part to be integrated
- Click the Add Position button
To remove a position:
To start the scan, click the Start Integration button
Full
The full integration is the easiest mode: it allows to select as many positions as needed and in which degree the plate must tilt to complete the image.
Then, by clicking the Start Integration button, the scanner will tilt the model and carry out a 360° acquisition using the number of positions selected.
Change Strategy
When the Project Tree is created, the software will select a specific strategy for every element in the project, trying to maximize the scan quality and saving space. To change the strategy for a specific element of the project:
- Right click on the element in the project tree
- Select Change Strategy
- Select the new strategy from the dropdown menu
The new scan of the object will be performed using the new strategy instead of the old one
It's possible to return to the Main Page or continue to the Data Editing page